SOP for BJ88 CAD
- Shane Kim
- Jun 24
- 2 min read
Updated: 5 days ago
Access the CAD Masterfile to find the login details and corresponding link.
BLUSKY REPORTING |
|
GIGADAT |
|
COMMUNICATION CHANNEL |
|
G-SHEET REPORT |
|
BLUSKY REPORTING |


GIGADAT |


TRANSACTION STATUS
SUCCESS | Successful |
INITED | Processing; not successful |
REJECTED | Disapproved |
EXPIRED | Disapproved |
TYPES OF TRANSACTIONS
RTO | WITHDRAWAL |
RTX | WITHDRAWAL |
ETI | DEPOSIT |
RFM | DEPOSIT |
TRANSACTION INQUIRY to GIGADAT SUPPORT For transaction inquiry email > tx_inquiry@gigadatsolutions.com and cc. TL Fiona
Hi Team, Kindly check this withdrawal transaction Txn ID: XXXXXXXXX Amount: XX CAD Concern: Still PG Processing Thank you! -Company Name |

G-SHEET REPORT
PG DAILY REPORT | |
CASH FLOW TRACKER | |
MONTHLY REPORT |
Procedure on plotting on GIGADAT Daily Report

Melon BO - Right Table
Download the Deposit/Withdrawal File from Melon BO.
Locate the Transaction ID (TRX ID) in the file.
Copy the TRX ID details from left to right and paste them on the right side of the deposit table. After plotting the transactions in the right table, proceed to the left table:
PG BO - Left Table
Open BlueSky and navigate to Transactions.
Search for the Transaction ID (TRX ID) in BlueSky.
Click the TRX ID, then click Download.
Copy the TRX ID details from left to right and paste them on the left side of the deposit table. to be continued...
Comments